Gila Gravity Main Headworks Gates Replacement Project

Gila Gravity Main Headworks Gates Replacement Project

The Gila Gravity Main Canal Headworks Structure was completed in 1938 and placed into operation in 1939. This facility is located at the Imperial Dam, and 18 miles north of Yuma, Arizona. The three existing radial gates have exceeded their useful service life, are in poor condition and in need of replacement. Gracon will work closely with the Imperial Irrigation District to fabricate and deliver three (3) new radial gates and radial gate arms.