This project consisted of design engineering and construction. This project expands the client's Wheat Mids storage and loadout capacity to accommodate the new demands after the B-Mill expansion. The construction included utilities, demolition, foundation, building structures, purchase and installation of equipment, mechanical, electrical, painting, inspections,...

The purpose of this project is to expand their flour milling capacity with added equipment and re-flowing of their existing mill. This project included engineering, utilities, demolition, concrete, building structures, equipment purchase and installation, mechanical work, painting, permitting, testing, and start-up....

This design/ build project was a remodel/refurbish of a Mid-1900’s grain elevator in Eastern Colorado. The purpose of the project was to create an organic flour mill for locally grown organic wheat to be milled. Worked consisted of repairing foundations and slabs, structural modifications of...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]This project for Rembrandt Foods consisted of a 4,500 SF Tank Loadout and Engine Room precast addition, as well as a 5,000 SF interior remodel for a new cooked egg patty process line.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s project for Essentia Protein Solutions included the construction of a hot water storage tank foundation and tank pad. We were also responsible for a new retaining wall, setting a new 40,000-gallon tank, and constructing a new insulated...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s Sifter Replacement project for a worldwide producer of pasty baking products was a retrofit installation of a new flour and sugar sifter. This project was at one of the client’s four productions facilities based in the U.S....

Dahlgren Industrial was contracted to coordinate, and install, a new intake hood on the Darigold Lynden Dryer 88 along with structural upgrades.  All work had to be completed within a 10-hour plant shutdown period and included the removal of existing HVAC, cutting of IMP wall...

This original coffee roasting and processing facility was modernized and combined with their warehouse and storage facility.  This project involved the relocation of all production equipment from the original facility to a new building.  The relocated equipment included coffee roasters, grinders and packaging machines.  New...

Non Fat Milk Dryer Coopersville, MI Year: 2010-2012 Nonfat milk dryer design/build project at the Brownfield 4mm lbs./day condensing and drying plant, containing a Tetra Pak CPS dryer with the receiving, wet process, and dry process plants. These were all contained within a new precast...

Dahlgren was contracted by the client to provide design-assisted construction management at an existing facility in Boardman, Oregon. The project included the construction of an additional 66,000 sq. ft. The new area consisted of a WPC 80 dryer (whey protein content 80), lactose dryers, a...