Dahlgren performed a large remodel on this project, taking the plant from 10 ½ million pounds of milk a day to 14 ½ million pounds of milk a day. Work on the project included installing a new dryer tower, three truck bays, new milk receiving...

This $200 million project included a new infant formula plant with a designed total area of 270,000 sq. ft. on a 1.6 million sq. ft. site in Ontario, Canada. A precast concrete dryer tower was installed to a height of 130 feet, which included two...

Design/Build project to modify and expand an existing denim plant into a milk processing facility. Scopes included new receiving bays, tank vestibules, wet processing areas, evaporator, dryer tower, central plant, butter processing plant/cooler, packaging, offices, labs, welfare/support spaces, and updating the existing warehouse and site....

This project was a design/build milk intake expansion and butter production plant. Dahlgren’s work consisted of raw silo alcoves vestibule, pasteurized silo alcoves vestibule, wet process room, and a butter process room. It also included the filler room, box erector room, remelt room, hot water...

Constructed a 6,386 sq. ft. freezer expansion to an existing operation food warehouse facility. This was done with structural steel and Insulated Metal Panel construction and was performed on schedule while working around the owner's operational truck dock facility in the immediate area. Project included...

This series of projects included a phased modernization and installation of an existing warehouse into a space for receiving, processing, and packaging whey lines for commercial distribution.   The multi-year development included phased construction of raw material and overflow warehouses, multiple weigh stations, blenders, bag fillers, and...

The DFA Shuttle Yard consisted of a large 15-acre truck parking area of an 18-acre overall site, a main building with five truck bays for milk sampling and CIP of milk tanks for sanitization, and a separate semi-truck wash facility. The parking area was 15...

This new 75,000 sq. ft. beef processing facility and 10,000 sq. ft. corporate headquarters is composed of site-cast concrete tilt up panels. The main production area for beef fabrication is lined with 4″ insulated liner panels, creating a sanitary, washable cooler box. The ceiling in...