Archive

The Goff Bayou Radial Gate Replacement project focuses on the replacement of two existing roller gates with slide gates. Additional project scope includes the repairing of scour areas behind and below the wingwalls of the gate structure, as well as the installation of articulating concrete...

This project consisted of design engineering and construction. This project expands the client's Wheat Mids storage and loadout capacity to accommodate the new demands after the B-Mill expansion. The construction included utilities, demolition, foundation, building structures, purchase and installation of equipment, mechanical, electrical, painting, inspections,...

The purpose of this project is to expand their flour milling capacity with added equipment and re-flowing of their existing mill. This project included engineering, utilities, demolition, concrete, building structures, equipment purchase and installation, mechanical work, painting, permitting, testing, and start-up....

This design/ build project was a remodel/refurbish of a Mid-1900’s grain elevator in Eastern Colorado. The purpose of the project was to create an organic flour mill for locally grown organic wheat to be milled. Worked consisted of repairing foundations and slabs, structural modifications of...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]This project for Rembrandt Foods consisted of a 4,500 SF Tank Loadout and Engine Room precast addition, as well as a 5,000 SF interior remodel for a new cooked egg patty process line.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s project for Essentia Protein Solutions included the construction of a hot water storage tank foundation and tank pad. We were also responsible for a new retaining wall, setting a new 40,000-gallon tank, and constructing a new insulated...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s Sifter Replacement project for a worldwide producer of pasty baking products was a retrofit installation of a new flour and sugar sifter. This project was at one of the client’s four productions facilities based in the U.S....

Gracon subcontracted to American West and worked with Denver Water on the installation of 66-inch and 6-inch knife gate valve assemblies and Hydraulic Power Unit Skid. Gracon overcame the challenges of both an extremely tight time schedule and congested work area to finish this project....

Gracon removed coatings at 16 locations on each P5 and P6 tubes. Drilled holes at 16 locations on each tube and installed flowmeter feed through devices. We provided and installed new portable console and temporary transducer cabling for testing and commissioning....

Gracon is providing and installing a new rotary phase converter, a new 480volt 125amp panelboard, and intercepting existing conduits that are connecting to a new panel.  In addition the project consists of replacing conduit connections for new valve actuators, replacing conductors to valves, supplying and...