[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]This project for Rembrandt Foods consisted of a 4,500 SF Tank Loadout and Engine Room precast addition, as well as a 5,000 SF interior remodel for a new cooked egg patty process line.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s project for Essentia Protein Solutions included the construction of a hot water storage tank foundation and tank pad. We were also responsible for a new retaining wall, setting a new 40,000-gallon tank, and constructing a new insulated...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon’s Sifter Replacement project for a worldwide producer of pasty baking products was a retrofit installation of a new flour and sugar sifter. This project was at one of the client’s four productions facilities based in the U.S....

Gracon subcontracted to American West and worked with Denver Water on the installation of 66-inch and 6-inch knife gate valve assemblies and Hydraulic Power Unit Skid. Gracon overcame the challenges of both an extremely tight time schedule and congested work area to finish this project....

Gracon removed coatings at 16 locations on each P5 and P6 tubes. Drilled holes at 16 locations on each tube and installed flowmeter feed through devices. We provided and installed new portable console and temporary transducer cabling for testing and commissioning....

Gracon is providing and installing a new rotary phase converter, a new 480volt 125amp panelboard, and intercepting existing conduits that are connecting to a new panel.  In addition the project consists of replacing conduit connections for new valve actuators, replacing conductors to valves, supplying and...

Dahlgren Industrial was contracted to coordinate, and install, a new intake hood on the Darigold Lynden Dryer 88 along with structural upgrades.  All work had to be completed within a 10-hour plant shutdown period and included the removal of existing HVAC, cutting of IMP wall...

This original coffee roasting and processing facility was modernized and combined with their warehouse and storage facility.  This project involved the relocation of all production equipment from the original facility to a new building.  The relocated equipment included coffee roasters, grinders and packaging machines.  New...

Non Fat Milk Dryer Coopersville, MI Year: 2010-2012 Nonfat milk dryer design/build project at the Brownfield 4mm lbs./day condensing and drying plant, containing a Tetra Pak CPS dryer with the receiving, wet process, and dry process plants. These were all contained within a new precast...

Dahlgren was contracted by the client to provide design-assisted construction management at an existing facility in Boardman, Oregon. The project included the construction of an additional 66,000 sq. ft. The new area consisted of a WPC 80 dryer (whey protein content 80), lactose dryers, a...