This $1.5M piping project includes replacing raw water piping, generator air coolers, air conditioner coils, and water piping. Gracon also performed lead-based paint abatement and reconnected mechanical equipment to existing electrical connections.
The Beaver Dam Powerplant uses two 56 MW turbines to generate over 6,000,000 MWh. Gracon replaced piping for both units.