Gracon installed a new high lift pump system on each of the eight 61 MW units. On two of the units, Gracon installed new thrust bearing coolers and piping, and machined and installed two new turbine shaft sleeves. We also machined the final diameter of three additional shaft sleeves and machined and repaired two packing box housings.
May 2015
May 2015
US Army Corps of Engineers
Chamberlain, South Dakota