Big Bend Powerhouse Raw Water Header Replacement

Big Bend Powerhouse Raw Water Header Replacement

Gracon was responsible for installing new isolation valves and floor operator stands; removing and replacing the existing isolation valves, motorized valve actuators, valve stem extensions, miter gear assemblies, floor operator stands, strainers, and strainer equipment pads; removing the existing orifice plates and associated flow meters; installing new magnetic flow meters; and minor modifications to the raw water piping.

Category
Piping
Owner

USACE

Start

October 2018

Completed

October 2019

Location

South Dakota