Big Bend Powerhouse Raw Water Heater Replacement

About This Project

Gracon was responsible for installing new isolation valves and floor operator stands. We removed and replaced the existing isolation valves, motorized valve actuators, valve stem extensions, miter gear assemblies, floor operator stands, strainers, and strainer equipment pads. Work also included removing the existing orifice plates and associated flow meters, installing new magnetic flow meters, and minor modifications to the raw water piping. 

Start

October 2018

Completed

October 2019

Owner

USACE

Location

Big Bend, South Dakota

Category
Piping