Gracon was responsible for installing new isolation valves and floor operator stands. We removed and replaced the existing isolation valves, motorized valve actuators, valve stem extensions, miter gear assemblies, floor operator stands, strainers, and strainer equipment pads. Work also included removing the existing orifice plates and associated flow meters, installing new magnetic flow meters, and minor modifications to the raw water piping.