Gracon replaced the existing condensate line, which was corroded and unusable. Our team removed the old pipe and installed polymer laminate 3.4” piping. Since the new pipe had to be installed in one continuous piece, Gracon used a crane to move the spool to the necessary areas. Our team also provided traffic control during the construction effort and repaired the parking lot affected by the pipe placement.