Project Sector | Dam Rehab

Location | Cascade, CO

Crystal Creek Dam Improvements

Colorado Springs Utilities, $5.9M
Gracon led a full-scope rehabilitation of Crystal Creek Dam, located at 9,000 feet on Pike’s Peak. Work included removing sediment and old coatings from the steel dam face and concrete plinth, preparing and recoating the entire steel face, and repairing the plinth concrete. The team also restored the reservoir outlet structure’s trash racks, repaired the auxiliary spillway’s concrete walls and bottom slab, and removed the existing outlet piping and valves, replacing them with new pipe, valves, and a hydraulic-actuated slide gate in the outlet structure. Additional scope included grouting the existing outlet tunnel, abandoning the old 20-inch drop inlet spillway structure, extending conduit for water-level instrumentation from the dam crest to the base of the steel face, and installing a new cathodic protection system and open standpipe piezometer. The project demanded working at high altitude in extreme mountain weather, running new piping through existing piping inside an underground tunnel, installing a staff gauge on an extremely steep slope, and dewatering the reservoir to keep construction areas manageable. Despite these challenges, the project was completed successfully to the client’s satisfaction.

Get In Touch