Project Sector | Specialty Piping
Location | Golden, CO
CSM Energy and Mineral Research Facility Infrastructure
Colorado School of Mines, $5.5M
This project delivered steam and condensate pipe installation via direct-bury, pre-insulated steel pipe, including all excavation, bedding, pipe laying, welding, backfill, and concrete along with chilled water supply and return lines using direct-bury HDPE pipe. Gracon also replaced steam and condensate piping in an existing tunnel and replaced the campus’s copper domestic water system. Additional work included installing duplex sump pumps and controls, vault ventilation fans, and new electrical and controls systems tied into the client’s existing Building Automation System. Operating on a live campus environment meant navigating challenging logistics, tight sequencing, and extremely constrained access to work areas — and the client was impressed enough with the team’s safety, quality, and cost performance that they continually expanded Gracon’s scope.