Project Sector | Specialty Piping

Location | Boulder, CO

CU Boulder Clean Thermal Energy Transition, Phase 1

CU Boulder, $5M
Gracon installed hot water heating supply and return piping using direct-bury, pre-insulated steel pipe, complete with excavation, bedding, welding, backfill, and concrete work. To keep buildings operational throughout construction, the team furnished and installed temporary boiler systems, then installed new heat exchangers and hydronic piping across multiple mechanical rooms. Scope also included new copper domestic water piping through several student housing buildings, new recirculation pumps, and a new controls system integrated with the client’s existing BAS. As with the CSM project, the live campus setting brought demanding logistics and tight access — but the project was completed within its original schedule and budget.