Project Sector | Specialty Piping
Location | Boulder City, NV
Hoover Dam – Multiple and Ongoing Projects
Gracon has built a long-standing relationship with the Bureau of Reclamation, and Hoover Dam is where that trust shows most clearly. Time and again, USBR has chosen Gracon for mission-critical mechanical, piping, and electrical work at one of America’s most recognizable engineering landmarks. Our projects include replacing the potable water lines serving the Visitor Center and the bench tank, replacing fire water supply piping on both the Nevada and Arizona sides of the powerhouse, replacing the penstock belly drain valves, and rebuilding the cooling ring piping for the N1 and N2 hydroelectric units. Much of this work was 100% self-performed, giving the Bureau a single accountable team from fabrication through final testing.
Hoover Dam is not an easy place to work. Our crews have worked in tight powerhouse spaces, steep hillsides, and tunnels, and in 30-foot penstocks with frigid water running from Lake Mead. Many of our scopes had to be completed within short outage windows and in restricted areas, which called for close coordination with Bureau personnel and other contractors. We maintained strict welding quality control and put safeguards in place to protect personnel from hazards such as hexavalent chromium. Every pressure piping system we installed was energized to operational pressure and leak tested before turnover. This kind of careful planning and execution keeps critical infrastructure running, and it’s why the Bureau of Reclamation keeps calling on Gracon.
Get In Touch












