Project Sector | Dam Rehab
Location | Paonia, CO
Paonia Dam
US Bureau of Reclamation, $4.5M
Near Somerset, CO, Gracon replaced all four high-pressure slide gates at Paonia Dam, a project that required installing a 12-foot diameter bulkhead at the bottom of the lake using a barge-mounted crane and divers. The scope also included hydro-demolition of various concrete structures to access the underground dam facilities, installation of roughly 600 linear feet of 16-inch steel pipe, and replacement of all corroded ladders and platforms in the 10-foot diameter by 140-foot deep access shaft. Detailed scope items included concrete hydro-demolition; tunnel ventilation and utilities for construction use; placement of 12,000 psi concrete; disassembly and inspection of the existing slide gates; replacement of all four gates and refurbishment of their frames; installation of the 12-foot bulkhead; replacement of miscellaneous metal platforms and ladders; installation of approximately 800 feet of 16″ stainless steel air relief piping; level gauge and PVC vent piping installation; concrete repairs on the intake tunnel; and installation of new 12″ knife gate valves. Working in a remote location with challenging access, the team delivered results that satisfied stakeholders and should keep the outlet works in good operating condition for another 50 years.