Ralston Dam Upstream Control Renovation

Denver Water, $3.5M
Subcontracted to American West Construction, Gracon partnered with Denver Water on the installation of 66″ and 6″ knife gate valve assemblies and a hydraulic power unit skid at Ralston Dam. The scope also included disassembling, refurbishing, and reassembling an existing 4-foot by 5-foot slide gate, and installing 65 feet of 66″ stainless-steel liner pipe designed to be grouted into place. Gracon self-performed installation of 7,000 feet of small-diameter stainless steel hydraulic pipe to operate the new gates and valves, as well as construction of a new concrete intake structure at the bottom of Ralston Reservoir. The biggest hurdles were an accelerated schedule — driven by downstream water agreements — and a congested work area, both of which the team navigated to finish on schedule and on budget.