Project Sector | Protein and Ready to Eat
Location | Rembrandt, IA
Rembrandt Foods
This $13M project delivered a 4,500 SF tank loadout and engine room precast addition alongside a 5,000 SF interior remodel to support a new cooked egg patty process line — including a new oven room, oiler room, freezer, GMP/entry room, case erection room, and palletizer room, plus a new MCC room mezzanine. Scope also included new underground process waste, electrical, steam, air, water, gas, fire protection, and ammonia refrigeration systems serving the production area and equipment, along with new floors, insulated panel walls and ceilings, stainless access mezzanines, doors, and urethane floor coatings. Facing a very tight schedule with a fixed in-service date, the team relied on substantial overtime and extra planning to finish on time.
Get In Touch