History

Gracon Timeline

1981: Gracon Corporation Founded

 0
 0
Share
Gracon was founded in 1981 by Gerald R. Ashbach in Berthoud, Colorado (G-R-A from his initials, and C-O-N for Construction).
Read more

1983: Granite Reef Aqueduct, First Tainter Gate Project.

 0
 0
Share
Gracon was awarded its first tainter gate project by the US Bureau of Reclamation in 1983.
Read more

1983: Titan II Missile Silo Dismantlement

 0
 0
Share
In 1983 US Army Corps of Engineers awarded Gracon the Titan II Dismantlement project for 17 of the 18 missile sites near Tucson Arizona.
Read more

1987: Misty Picture Project, Simulated Nuclear Explosion

 0
 0
Share
In 1987 the Defense Nuclear Agency awarded Gracon the Helium Flow and Control Contract portion of the Misty Picture Project.
Read more

1989: First Hydroelectric Project, Waddell Pump-Generating Plant

 0
 0
Share
In 1989, Gracon was awarded its first hydroelectric project as a subcontractor to Voith Hydro.
Read more

1990: Rocky Mountain Project, First Large Piping Project

 0
 0
Share
Gracon performed piping system work for the Oglethorpe Power owned Rocky Mountain Project near Rome, Georgia.
Read more

1990: Grand Forks AF Base, First of 20 Years of SABER Contracting

 0
 0
Share
Gracon was awarded the first SABER contract at Grand Forks AFB in August of 1990.
Read more

1992: Roosevelt Embedded Scroll Case Removal and Replacement

 0
 0
Share
Gracon worked as a subcontractor to Neyrpic Hydro (subsequently GE Alstom) on the Roosevelt Dam Power Plant rebuild for the US Bureau of Reclamation.
Read more

1996: JOCs/IDIQ

 0
 0
Share
During 1996 Gracon was awarded its first JOC’s (Job Order Contract) at Ft. Bragg, NC, Fort Dum, NY, Ft/ Rucker, AL and an IDIQ project at White Sands Missile Range, NM/Ft. Bliss, TX.
Read more

1997: Friant Dam Gate Largest Obermeyer Gate

 0
 0
Share
Gracon was the prime contractor on the Friant Dam, California contract for the US Bureau of Reclamation to replace two 100’ long drum gates with 18’ high air actuated steel crest gates designed and furnished by Obermeyer Hydro.
Read more

1998: First Campus Piping Project, University of Northern Colorado

 0
 0
Share
Gracon wins their first campus piping project, High Temperature, Hot Water Piping, was with the University of Northern Colorado.
Read more

2000: Headgate Rock Powerplant, First Digital Governor Conversion

 0
 0
Share
Gracon established a strong relationship with Woodward Governor (and later, GE) in 2000 when we converted the mechanical governor system at Headgate Rock Power Plant to a digital governor system.
Read more

2004: Hathida Dam Power Plant, First International Project

 0
 0
Share
Gracon traveled to Iraq to inspect and report on the facility with CH2M Hill in the spring of 2004, one year after US Army Rangers seized the dam to prevent its destruction by Iraqi forces under Saddam Hussein’s control.
Read more

2008: Crisis City First Responder Training Site, First LEED Building

 0
 0
Share
Gracon built this unique Design-Build project for the State of Kansas Division of Emergency Management.
Read more

2012: Lewiston Powerhouse, Multi-Year, Multi-Unit Hydropower Project

 0
 0
Share
In 2012, Gracon started disassembly, refurbishment, and reassembly on the first of twelve vertical Allis Chalmers pump/turbine generators for Hitachi at the Lewiston Pump Generating Plant.
Read more

2014: Gracon LLC

 0
 0
Share
In July 2014, Gracon LLC was formed with the purchase of Gracon Corporation.
Read more

2018: Gracon Relocates From Loveland to Lafayette

 0
 0
Share
Gracon outgrew our existing facilities and relocated to Lafayette.
Read more

2019: Partners with Dahlgren Industrial

 0
 0
Share
Gracon and Dahlgren Industrial announced a permanent Joint Venture between the companies.
Read more