In 1987 the Defense Nuclear Agency awarded Gracon the Helium Flow and Control Contract portion of the Misty Picture Project.
Read more
1989: First Hydroelectric Project, Waddell Pump-Generating Plant
1 January, 1989
0
0
Share
In 1989, Gracon was awarded its first hydroelectric project as a subcontractor to Voith Hydro.
Read more
1990: Rocky Mountain Project, First Large Piping Project
1 January, 1990
0
0
Share
Gracon performed piping system work for the Oglethorpe Power owned Rocky Mountain Project near Rome, Georgia.
Read more
1990: Grand Forks AF Base, First of 20 Years of SABER Contracting
1 January, 1990
0
0
Share
Gracon was awarded the first SABER contract at Grand Forks AFB in August of 1990.
Read more
1992: Roosevelt Embedded Scroll Case Removal and Replacement
1 January, 1992
0
0
Share
Gracon worked as a subcontractor to Neyrpic Hydro (subsequently GE Alstom) on the Roosevelt Dam Power Plant rebuild for the US Bureau of Reclamation.
Read more
1996: JOCs/IDIQ
1 January, 1996
0
0
Share
During 1996 Gracon was awarded its first JOC’s (Job Order Contract) at Ft. Bragg, NC, Fort Dum, NY, Ft/ Rucker, AL and an IDIQ project at White Sands Missile Range, NM/Ft. Bliss, TX.
Read more
1997: Friant Dam Gate Largest Obermeyer Gate
1 January, 1997
0
0
Share
Gracon was the prime contractor on the Friant Dam, California contract for the US Bureau of Reclamation to replace two 100’ long drum gates with 18’ high air actuated steel crest gates designed and furnished by Obermeyer Hydro.
Read more
1998: First Campus Piping Project, University of Northern Colorado
1 January, 1998
0
0
Share
Gracon wins their first campus piping project, High Temperature, Hot Water Piping, was with the University of Northern Colorado.
Read more
2000: Headgate Rock Powerplant, First Digital Governor Conversion
1 January, 2000
0
0
Share
Gracon established a strong relationship with Woodward Governor (and later, GE) in 2000 when we converted the mechanical governor system at Headgate Rock Power Plant to a digital governor system.
Read more
2004: Hathida Dam Power Plant, First International Project
1 January, 2004
0
0
Share
Gracon traveled to Iraq to inspect and report on the facility with CH2M Hill in the spring of 2004, one year after US Army Rangers seized the dam to prevent its destruction by Iraqi forces under Saddam Hussein’s control.
Read more
2008: Crisis City First Responder Training Site, First LEED Building
1 January, 2008
0
0
Share
Gracon built this unique Design-Build project for the State of Kansas Division of Emergency Management.
In 2012, Gracon started disassembly, refurbishment, and reassembly on the first of twelve vertical Allis Chalmers pump/turbine generators for Hitachi at the Lewiston Pump Generating Plant.
Read more
2014: Gracon LLC
1 January, 2014
0
0
Share
In July 2014, Gracon LLC was formed with the purchase of Gracon Corporation.
Read more
2018: Gracon Relocates From Loveland to Lafayette
1 January, 2018
0
0
Share
Gracon outgrew our existing facilities and relocated to Lafayette.
Read more
2019: Partners with Dahlgren Industrial
1 January, 2019
0
0
Share
Gracon and Dahlgren Industrial announced a permanent Joint Venture between the companies.