18 Mar Oahe Dam Motor Control Center Project
USACE Omaha District has awarded Gracon’s electrical division the Oahe Dam Motor Control Center and Panels Replacement project. This project has a challenging scope of work and schedule for replacing 20 Motor Control Centers (MCCs), consisting of AC and DC voltages in multiple locations around the powerhouse. In addition, we will be replacing 15 power panels in the powerhouse along with 13 power panels in the intake structure.