Gracon rehabilitated all gates at the South Boulder Diversion Dam for Denver Water. Removal, rehabilitation, and reinstallation of three sluice gates and the rehabilitation of two radial gates, that were 17’x20’ and 6’x8’ was performed. The project also included lead abatement, coatings, installing an 8’x8’ bulkhead for the smaller radial gate, and electrical work.
September 2017
April 2018
Denver Water
Boulder, CO