Gracon was contracted by the Bureau of Reclamation to remove existing pump equipment at Cawker City and Downs. The pumping units were replaced including mechanical and electrical upgrades. In addition, Gracon removed the sum-pump at Downs Pumping Plant and replaced a 24-inch slide gate at the intake structure.
January 2018
August 2020
USBR
Kansas