Archive

Gracon removed coatings at 16 locations on each P5 and P6 tubes. Drilled holes at 16 locations on each tube and installed flowmeter feed through devices. We provided and installed new portable console and temporary transducer cabling for testing and commissioning....

Gracon is providing and installing a new rotary phase converter, a new 480volt 125amp panelboard, and intercepting existing conduits that are connecting to a new panel.  In addition the project consists of replacing conduit connections for new valve actuators, replacing conductors to valves, supplying and...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_separator type="small" position="left" down="30"][vc_column_text]Gracon replaced two disconnects and two motor controllers with two stainless steel combination disconnect motor controllers for the Hydraulic Power Unit (HPU) that controls opening and closing of the service gates. In addition, the project...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Replaced two outdated control panels for the service gates with two new stainless steel control panels.  Additional control conduit and conductors were installed to expand the control to include two emergency gates that were originally only operated by...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_separator type="small" position="left" down="30"][vc_column_text]Gracon was chosen by USBR to replace aging potable water lines that service the Visitor Center at Hoover Dam, among many other facilities at the top of the dam. Gracon’s electrical division is installing two...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]The project consists of replacing an existing 42-inch fixed cone valve which has been in service since the reservoir was constructed. To replace the valve and emergency gates, Gracon will install an isolation device on the hydraulic intake...