Pine Creek

Pine Creek

Replaced two outdated control panels for the service gates with two new stainless steel control panels.  Additional control conduit and conductors were installed to expand the control to include two emergency gates that were originally only operated by a hand pump.  Two electrically actuated valves were replaced, and two valves were added to control the hydraulic control of the emergency gates.

Category
Electrical
Start

August 2019

Completion

March 2020

Owner

USACE

Location

Pine Creek Dam, OK