Gracon removed coatings at 16 locations on each P5 and P6 tubes. Drilled holes at 16 locations on each tube and installed flowmeter feed through devices. We provided and installed new portable console and temporary transducer cabling for testing and commissioning.
November 2020
March 2022
USBR
Grand Coulee Dam, Washington