John Keys III Pump Generating Plant

About This Project

Gracon removed coatings at 16 locations on each P5 and P6 tubes. Drilled holes at 16 locations on each tube and installed flowmeter feed through devices. We provided and installed new portable console and temporary transducer cabling for testing and commissioning.

Start

November 2020

Completion

March 2022

Owner

USBR

Location

Grand Coulee Dam, Washington

Category
Electrical