Ozark Powerhouse Treated Water Plant Rehabilitation

About This Project

Gracon completed a piping contract for the Army Corps of Engineers at Ozark Powerhouse. The project included demolishing the filters in the existing treated water plant with associated piping and controls. Gracon installed Turbo-Disc filter systems, connected electrical and controls, and performed system testing and training. Pipe sizes varied from ¾” to 6” bronze, copper, and galvanized. Gracon completed this project over a month ahead of schedule.

Started

November 2015

Completed

May 2016

Owner

Army Corps of Engineers

Location

Franklin County, Arkansas

Category
Piping