Archive

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text][/vc_column_text][vc_column_text]Gracon replaced the aging electrical and mechanical infrastructure at the Roberts Tunnel East Portal, near Grant, CO. This $10M project includes upgrading the existing electrical systems with three new switchgear units which will transfer electrical power from the...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text][/vc_column_text][vc_column_text]Gracon was a subcontractor for the refurbishment of two Liquid Rheostat Pony Motor Starting rheostats.  This included the disassembly, blasting and painting, and installation of the new owner furnished internal electrodes and wiring to the control room.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Gracon was awarded this contract to repair cavitation damage on Diablo Powerhouse’s Hydro-Generator #32 turbine runner. Gracon is partnering with Cutting Edge Onsite Machining to safely remove the cavitation damage and re-weld new filler material in place on the 146” diameter...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text][/vc_column_text][vc_column_text]Gracon rehabilitated all gates at the South Boulder Diversion Dam for Denver Water. Removal, rehabilitation, and reinstallation of three sluice gates and the rehabilitation of two radial gates, that were 17’x20’ and 6’x8’ was performed. The project also...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text][/vc_column_text][/vc_column][/vc_row][vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]Antero Dam’s gate house had to be rebuilt at a higher elevation due to raising the elevation of the dam by Moltz, which was a large part of their work. Gracon...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text]The Strontia Springs Dam reservoir’s emergency reservoir drawdown system (ERDS) rapidly releases water in an emergency scenario through a 50 ft. long tunnel that runs through the base of the dam. The thrust nut on the ERDS control...