Archive

Gracon was contracted by the Bureau of Reclamation to remove existing pump equipment at Cawker City and Downs. The pumping units were replaced including mechanical and electrical upgrades. In addition, Gracon removed the sum-pump at Downs Pumping Plant and replaced a 24-inch slide gate at...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_separator type="small" position="left" down="30"][vc_column_text]Gracon was responsible for installing new isolation valves and floor operator stands. We removed and replaced the existing isolation valves, motorized valve actuators, valve stem extensions, miter gear assemblies, floor operator stands, strainers, and strainer equipment pads. Work also...

Gracon installed two Tranter Heat Exchangers, four Bell & Gossett Circulating Pumps, and three Aircoil Ice Storage Tanks for Hewlett Packard at their Fort Collins, Colorado facility....