Dahlgren Industrial was contracted to coordinate, and install, a new intake hood on the Darigold Lynden Dryer 88 along with structural upgrades.  All work had to be completed within a 10-hour plant shutdown period and included the removal of existing HVAC, cutting of IMP wall...

This original coffee roasting and processing facility was modernized and combined with their warehouse and storage facility.  This project involved the relocation of all production equipment from the original facility to a new building.  The relocated equipment included coffee roasters, grinders and packaging machines.  New...

Non Fat Milk Dryer Coopersville, MI Year: 2010-2012 Nonfat milk dryer design/build project at the Brownfield 4mm lbs./day condensing and drying plant, containing a Tetra Pak CPS dryer with the receiving, wet process, and dry process plants. These were all contained within a new precast...

Dahlgren was contracted by the client to provide design-assisted construction management at an existing facility in Boardman, Oregon. The project included the construction of an additional 66,000 sq. ft. The new area consisted of a WPC 80 dryer (whey protein content 80), lactose dryers, a...

Dahlgren performed a large remodel on this project, taking the plant from 10 ½ million pounds of milk a day to 14 ½ million pounds of milk a day. Work on the project included installing a new dryer tower, three truck bays, new milk receiving...

This $200 million project included a new infant formula plant with a designed total area of 270,000 sq. ft. on a 1.6 million sq. ft. site in Ontario, Canada. A precast concrete dryer tower was installed to a height of 130 feet, which included two...

Design/Build project to modify and expand an existing denim plant into a milk processing facility. Scopes included new receiving bays, tank vestibules, wet processing areas, evaporator, dryer tower, central plant, butter processing plant/cooler, packaging, offices, labs, welfare/support spaces, and updating the existing warehouse and site....

This project was a design/build milk intake expansion and butter production plant. Dahlgren’s work consisted of raw silo alcoves vestibule, pasteurized silo alcoves vestibule, wet process room, and a butter process room. It also included the filler room, box erector room, remelt room, hot water...

Constructed a 6,386 sq. ft. freezer expansion to an existing operation food warehouse facility. This was done with structural steel and Insulated Metal Panel construction and was performed on schedule while working around the owner's operational truck dock facility in the immediate area. Project included...

This series of projects included a phased modernization and installation of an existing warehouse into a space for receiving, processing, and packaging whey lines for commercial distribution.   The multi-year development included phased construction of raw material and overflow warehouses, multiple weigh stations, blenders, bag fillers, and...